Verified Removal Rates
99.4%
PFAS and Solutes
98.0%
Process Water Reuse
0.0%
Chemical Additives


Industrial Case Study
500,000 GPD Recovery Facility
A Gulf Coast chemical processing site integrated our modular electro-oxidation skids to handle complex hazardous effluent. The closed-loop array eliminated off-site trucking fees and met zero liquid discharge limits continuously.
By converting raw discharge into high-purity process water onsite, the facility achieved 98% water recovery while reducing total operational expenditures by 42% within the first six months.
Municipal Engineering Proof
The electro-oxidation skids sustained 99.8% operational uptime across peak municipal loads while maintaining strict effluent compliance without chemical dosing.
Chief Water Engineer, Regional Utility District
Send us your raw influent analysis and discharge targets. Our engineering team will evaluate your stream and specify a custom modular treatment skid.